Akira Inokuma


 

The Present State of Lean Construction in Japan and a Better Way Forward

Many people are interested in the Japanese state of Lean Construction because Lean Construction has been born out from the Toyota Production System (TPS). Although I have been studying and introducing Lean Construction for some years, even now people who know the term "Lean Construction" seem to be less than 50 in number inside Japan. Outside Japan there is not so much information about the Japanese state of Lean Construction, which this contribution is aimed at presenting.

Lean Culture     Read more

Copyright © 2015- Lean Construction Blog