Lean Conferences


 

The Public Sector is Seduced by Lean Construction - LIPS 2016

The 24th Annual International Group for Lean Construction (IGLC) Conference and Research Summer School took place between July 18 and 24 in Boston, Massachusetts, USA. It was a very busy week of learning (and some social activities!) which was attended by over 250 academics and practitioners. This blog (Part 1) will cherry pick some of my key takeaways and highlights from the first two days of the week long industry and research programme.

Lean ConferencesRead more

 

IGLC Boston 2016: On the Brink of a Lean Revolution - Part 1

The 24th Annual International Group for Lean Construction (IGLC) Conference and Research Summer School took place between July 18 and 24 in Boston, Massachusetts, USA. It was a very busy week of learning (and some social activities!) which was attended by over 250 academics and practitioners. This blog (Part 1) will cherry pick some of my key takeaways and highlights from the first two days of the week long industry and research programme.

International Group For Lean ConstructionRead more

 

IGLC 23 Perth: Global Problems, Global Solutions

This month I want to share my highlights and takeaways from last month’s International Group for Lean Construction (IGLC) 23rd Annual Conference in Perth, Australia. The IGLC was founded in 1993, and makes up a network of professionals and researchers in architecture, engineering, and construction (AEC) who feel that the practice, education, and research of AEC has to be radically renewed in order to respond to the challenges ahead.

Internation Group for Lean Construction Read more

Copyright © 2015- Lean Construction Blog