Maximilian Weik


 

A Digital Approach to Implement and Use The Last Planner® System

The pros of using the Last Planner® System [1] in Projects is a well referred topic [2, 3, 4]. However, especially in a design phase with several participants who are located far away from each other, analog systems can be uneconomical. This was the biggest challenge during the implementation of a Lean Project Delivery System for the design phase of a residential home with about 800 apartments. The design team consisted of four organizations, two located in Germany, one in Austria, and another in Poland. Due to a tight budget, co-location was not an option.

Last Planner Read more

Copyright © 2015- Lean Construction Blog