Olli Seppänen


 

A Deeper Look into LBMS Controlling System – Preventing Cascading Delays

In my previous post about LBMS, I mentioned that cascading delays can cause project duration increases of 10% or more. This blog article digs a bit deeper and explains what cascading delays are, why they happen in construction projects and how LBMS controlling can help to prevent them.

Location Based Management Read more

 

Introduction to Location Based Management System: CPM on Steroids Combined with Flowline Visualization

The Location-based Management System (LBMS) builds on decades of work on location-based scheduling methods. The first recorded utilization of location-based methods in vertical construction was in the Empire State Building. More systematic approaches followed. Line-of-Balance was based on optimizing production of identical locations.

Last Planner    Takt Time Read more

Copyright © 2015- Lean Construction Blog