Nous contacter
info@leanconstructionblog.com

First Run Video Studies: Plan-Do-Check-Adjust
Plan-Do-Check-Adjust (PDCA) is an improvement cycle based on a scientific method of proposing a change, implementing the change, measuring the results, and adjusting as needed. It is also known as the Deming Cycle after W. Edwards Deming who introduced the concept in Japan in the 1950s1.
A3 - A Lean Approach to Problem Solving
An A3 is a simple one page format problem solving methodology that is based on lean principles. It makes communicating ideas simple and eliminates the need for constructing time consuming powerpoint presentations. The method is simple to apply, using pencil, paper (A3 format obviously!) and inputs from the team on the ground floor.