Lean Construction Blog Presents

LeanProjectDelivery

May 11–14, 2026
Silicon Valley, California

Keynote opens in

--
Days
:
--
Hours
:
--
Minutes
:
--
Seconds

Four Days of Lean Learning

May
11 · Mon

Gemba Walks — Sacramento

Site visits at Aro Homes and Mark III MEP in Sacramento. Observe lean practices in prefabrication facilities.

May
12 · Tue

Gemba Walks — San Francisco

Gemba walk at SFO International Airport with Clark Construction

May
13 · Wed

Keynote: Progressive Design Build

Keynote speakers Geoffrey Neumayr & Robynne Thaxton explore the frontier of Progressive Design Build.

8:45 – 9:45 AM  ·  60-min keynote + 15-min Q&A

#1 Clark Construction + SFO — Reliable Promises with LPS 10:15 – 10:55 AM
#2 CoBuild — Applying Lean on Small Scale TI Projects 11:10 – 11:50 AM
#3 Kinetic Construction — Small Projects, Big Wins: Unlocking the Power of IPD 2:00 – 2:40 PM
#4 Gilbane — AI + Lean Implementations in Projects 2:40 – 3:20 PM
#5 Swinerton — A Soft Landing: Delivering Projects with Predictability & Transparency through TAKT Implementation 3:35 – 4:15 PM

Happy Hour & Networking Reception — Network with the owners, general contractors, architects, engineers, and trades that are at the forefront of lean project delivery. 4:45 – 6:00 PM

May
14 · Thu

Keynote: Lean IPD — 20 Years of Learning

Keynote speakers Howard Ashcraft & Will Lichtig reflect on two decades of Lean Integrated Project Delivery.

8:45 – 9:45 AM  ·  60-min keynote + 15-min Q&A

#6 Aro Homes — Applying Prefab and Industrialized Construction for Single Family Homes 10:15 – 10:55 AM
#7 SC Builders + Datagrid — Practical Examples of Applying AI for Construction 11:10 – 11:50 AM
#8 Turner + Gensler — Last Planner in Design: The Importance of Making Informed Decisions 3:15 – 3:55 PM

Facilitated Live Lab — Onstage — Interactive session during lunch. 1:00 – 2:00 PM

Owners' Panel — Featuring representatives from Sutter Health, UC Davis Health, and UCSF Health. 2:00 – 3:00 PM

Happy Hour & Networking Reception — Network with the owners, general contractors, architects, engineers, and trades that are at the forefront of lean project delivery. 4:25 – 6:00 PM

Keynotes & Leadership

Geoffrey Neumayr
Geoffrey Neumayr
Keynote · May 13
Progressive Design Build
Robynne Thaxton
Robynne Thaxton
Keynote · May 13
Progressive Design Build
Howard Ashcraft
Howard Ashcraft
Keynote · May 14
Lean IPD 20 Years of Learning
Will Lichtig
Will Lichtig
Keynote · May 14
Lean IPD 20 Years of Learning

Industry Owners

Tom Martin
Tom Martin
Sutter Health
Douglas Whiteaker
Douglas Whiteaker
UC Davis Health
JD Ahearn
JD Ahearn
UCSF Health

Gemba Walks

Modular construction facility Sacramento
May 11 — Sacramento

Visit Aro Homes and Mark III for a hands-on look at lean manufacturing and modular construction processes in action.

Airport construction site San Francisco
May 12 — San Francisco

SFO International Airport with Clark Construction.

See What Prefab Is All About

Presenting Teams

1
Clark Construction + SFO
Reliable Promises with LPS
2
CoBuild
Applying Lean on Small Scale TI Projects
3
Kinetic Construction
Small Projects, Big Wins: Unlocking the Power of IPD
4
Gilbane
AI + Lean implementations in Projects
5
Swinerton
Takt for Healthcare Projects
6
Aro Homes
Applying Prefab and Industrialized Construction for Single Family Homes
7
SC Builders + Datagrid
Practical Examples of Applying AI for Construction
8
Turner + Gensler
Last Planner in Design - The Importance of Making Informed Decisions

Sponsors & Exhibitors

Venue

JJ Lake Business Center

Mountain View, California

📍
340 E Middlefield Rd
Mountain View, CA 94043
Free Parking Guest Wi-Fi Kitchen VIP Lounge Great California Weather Outdoor Networking Near SFO and San Jose Airports
Conference networking

Networking & Happy Hour

Conference sessions

Conference Sessions

Workshop and breakouts

Lunch & Networking

Speakers and panels

Lunch & Networking

Speakers and panels

Indoor & Outdoor Meeting Areas

Register Now

Individual — Virtual
$199
per person
  • ✓ Full 2-Day Conference
  • ✓ Conference Video Recording
  • ✓ Presentation Slides
  • ✓ Certificate of Attendance
Register Virtual

Silicon Valley, California  ·  May 13–14, 2026  ·  Questions? Contact us

Past Events

Our conferences are where the people actually doing the work come together.

Each event brings together the leading owners, general contractors, architects, engineers, and trades who are authentically implementing lean design and construction — not just talking about it. These are practitioners sharing real project experience: what worked, what didn't, and what they're doing differently next time.

The networking opportunities are unmatched. Whether you're an owner looking to adopt lean delivery on your next project, a GC refining your Last Planner implementation, or a trade partner exploring Takt for the first time, you'll find your people here — learning alongside those at the forefront of the industry.

Photos from Past Events

Past event photo 1
Photo 1 — Add image URL
Past event photo 2
Photo 2 — Add image URL
Past event photo 3
Photo 3 — Add image URL
Past event photo 3
Photo 3 — Add image URL
Past event photo 4
Photo 4 — Add image URL
Past event photo 5
Photo 5 — Add image URL
Past event photo 4
Photo 4 — Add image URL
Past event photo 4
Photo 4 — Add image URL

1 / 5  ·  Click arrows or dots to navigate