Lean Research


 

 

An A3 Template for Lean Research

In Lean Construction, we recognize that there are inherent wastes in every production system. Our objective is often to identify and reduce the wastes. Just as construction and design have been conceptualized as production systems, it can be argued that research is also a production system. Instead of producing a design or creating a product, the output of research is new knowledge. If research is truly a production system, then could we apply the same Lean methods and tools to drive out waste and improve its efficiency?

Lean Research    Read more

Copyright © 2015- Lean Construction Blog