Single Minute Exchange of Dies


 

Introduction to SMED: A Neglected Method in Lean Construction

Exchange of Dies, refers to a method in the Lean Production System that is used for quick, simplified and efficient production set-up and changeover from one product/process to another, which often constitute the major causes of production downtime (non-productive time/stoppages). It is one of the foundational blocks of a continuous, improved production flow.

SMED Read more

Copyright © 2015- Lean Construction Blog