First Run Studies


 

First Run Video Studies: Plan-Do-Check-Adjust

Plan-Do-Check-Adjust (PDCA) is an improvement cycle based on a scientific method of proposing a change, implementing the change, measuring the results, and adjusting as needed. It is also known as the Deming Cycle after W. Edwards Deming who introduced the concept in Japan in the 1950s.

First Run Studies Read more

Copyright Ā© 2015- Lean Construction Blog