LAST PLANNERLEAN CONSTRUCTION 101

Why Use the Last Planner System

As a superintendent, The Last Planner System is the most useful tool in my tool box. It forms the structure that allows me to develop a culture of trust and respect within my project teams. Allowing everyone involved in the project to feel like a valued part of a team that looks out for each other and works together.

LAST PLANNERLEAN CONSTRUCTION 101

An Abridged History of the Last Planner System®

Lean principles and practices initially developed independently within the construction industry. The early contributors to Lean Construction include Greg Howell, who learned the value of collaborative work from the commanding officer of a construction battalion on which he served.

LAST PLANNERLEAN CONSTRUCTION 101

What is the Last Planner System?

Its full name is the Last Planner System® of Production Control. Production control is necessary on projects to support working toward planned accomplishments, doing what can be done to move along a planned path, and when that becomes impossible, determine alternative paths that accomplish desired goals.

LAST PLANNERLEAN CONSTRUCTION 101

Daily Huddle 101

A superintendent once told me that he did not need a daily huddle. He was confident that he already knew everything that was happening on the project. I explained to him that the huddle was not for him. It was for the people leading the field crews.