Contact Information

info@leanconstructionblog.com

Related Webinars

all webinars
add one
SET BASED DESIGN

An Introduction to Set-Based Design

Set-based Design (SBD) is a design methodology that has many applications in the architecture, engineering, and construction (AEC) industry. It was discovered when researchers studied the engineering and design process at Toyota [1].

SET BASED DESIGN

How to Apply Set-Based Design in Construction

Traditional construction design management has struggled with an ad hoc approach to design, increasing the amount of rework and cost, in addition to reducing the ability to produce efficient designs according to customer needs.