Kontaktiere uns
info@leanconstructionblog.com
First Run Video Studies: Plan-Do-Check-Adjust
Plan-Do-Check-Adjust (PDCA) is an improvement cycle based on a scientific method of proposing a change, implementing the change, measuring the results, and adjusting as needed. It is also known as the Deming Cycle after W. Edwards Deming who introduced the concept in Japan in the 1950s1.
