Contact Information
info@leanconstructionblog.com
Related Webinars
all webinars
An Introduction to Set-Based Design
Set-based Design (SBD) is a design methodology that has many applications in the architecture, engineering, and construction (AEC) industry. It was discovered when researchers studied the engineering and design process at Toyota [1].
How to Apply Set-Based Design in Construction
Traditional construction design management has struggled with an ad hoc approach to design, increasing the amount of rework and cost, in addition to reducing the ability to produce efficient designs according to customer needs.