Contact Information
info@leanconstructionblog.com
Articles By This Author

Featuring Tammy McConaughy
I started me lean journey pursuing my six-sigma black belts and I further honed my expertise while working for a mechanical contractor in San Diego. Currently, I hold the position of Fellow of Lean Delivery at CRB.

Featuring Dominic Desmarais
As an engineer specializing in the design of production systems, I found myself in construction when I received a call from a company involved in modular construction and prefabrication. Intrigued by the challenge, I made the decision to join them in 2008.

Featuring George Hunt
I’m currently a Lean Director at Integrated Project Services (IPS). I would describe myself as a lifelong learner who enjoys absorbing information and constantly learning. I love to share that knowledge to help folks find a slightly better way of doing things.