Contact Information
info@leanconstructionblog.com
Articles By This Author

The Paradox of Lean Construction and the Case for Ambidexterity
This post aims to introduce the ambidextrous characteristics of lean construction (LC). Some studies have shown the rigid and flexible features in LC. However, these achievements cannot fully explain the whole nature of LC.