Contact Information

info@leanconstructionblog.com

Articles By This Author

LAST PLANNERSCRUM

Synergies between the Last Planner System and SCRUM

Historically, the greatest challenges in the construction industry are cost and schedule deviations that stem mainly from alterations in the sequence of activities, inefficient scheduling, and high waste rates of operational time, materials and operational efficiency.

WASTE

The Ratio of Value vs. Waste in Brazilian Infrastructure Projects

Brazil’s public and private infrastructure sector is investing in processes improvement and kaizen implementation. Included in this investment is a study of the of ratio of value added vs. non-value added activities on site.

LAST PLANNER

Using Pull Planning to Improve Design and Documentation Management in Solar Projects

Traditionally, Lean practices in construction have focused on production rather than design. However, the design phase is a critical point of failure in many projects. Delays in drawings or specifications can paralyze construction teams and lead to rework, increased costs, and wasted time.