Featuring John Strickland
My big idea very briefly is to apply Lean thinking to a big and common problem using Collaborative Design and Scoping (CDS) with Fundamental Scope Blocks (FSBs). Wouldn’t it be great if we did not need to spend the entire design budget and duration until we were confident the project was technically feasible.
The Common Origins of Lean Construction, Advanced Work Packaging and Project Production Management
Several institutions have formed over the past 30 years aimed at improving the performance of the construction industry. Among those institutions are the Construction Industry Institute (CII), the Lean Construction Institute (LCI) and the Project Production Institute (PPI.