Contact Information

info@leanconstructionblog.com

About Webinar

Current Sets work is at the heart of reducing waste. We strive to incorporate continuous improvement in our process as we build a review platform and perform coordination reviews to set up projects for successful construction proactively.

In this webinar, we will bring together three different perspectives who all work at Current Sets across architecture, construction, and engineering to talk about how we are actively working to reduce waste in the design review process by:

Our Strategic Approaches
  • Continuously improving processes and technology to augment experts
  • Leveraging version control to understand how design changes through time
  • Proactively cleaning up drawings to reduce downstream field issues


The discussion will emphasize practical strategies with real-world examples drawn from wide-ranging ground-up construction projects that Current Sets has reviewed. Attendees will gain direct, professional insights into streamlining design reviews and eliminating wasteful practices.

Presenter

Reb is a Licensed Architect with 15 years of experience in design, project coordination, and leadership across the U.S. and U.K. Currently, Coordination Review Manager at Current Sets, she specializes in modular construction and sustainable design, having reviewed over 200 multifamily housing projects. Her work spans single-family homes to large-scale developments, with a focus on coordination, high-performance, Modular/prefab and climate-responsive design. Previous roles include Architecture PM at Katerra and design work with KRDB, EcoDesign Consultants, and others. Reb holds a Master’s and Professional Diploma in Architecture from the Centre for Alternative Technology and a Bachelor of Architecture from the Glasgow School of Art.

He spent his earlier career in the field managing projects for general contractors. With a background in construction project management, he previously served as a Project Manager at Katerra and an Assistant Project Manager at CORE Construction, where he worked on a mix of multifamily, schools, and commercial buildings He’s passionate about innovation and efficiency and having spent thousands of hours looking at coordination is an ideal person to get your drawings ready for construction. He holds a B.E. in Mechanical Engineering from Oklahoma State University.

Bo started his career as an on-site Mechanical Design Engineer on the construction of Vogtle Nuclear Units 3&4. He saw firsthand the benefits and shortfalls of 2d and 3d coordination. He’s since worked on virtual reality training applications for NFL and Fortune 100 companies and worked on drawing and analytics products before starting Current Sets in 2020 with Andrew. Bo holds a B.E. in Mechanical Engineering from UVa and an MBA from UNC.