See the Future Before It Happens: AI-Powered Progress Tracking That Prevents Delays
What if you could know—with certainty—exactly where your project stands at any moment? What if you could spot schedule risks weeks before they become costly delays? What if progress tracking didn't require hours of manual walks, spreadsheets, and guesswork?
Join us for an eye-opening demonstration of Doxel—the AI-powered progress tracking platform that's helping industry leaders like DPR Construction, Layton Construction, Sundt, and QTS Data Centers build 11% faster while reducing cash outflows by 16%.
The Problem Every Project Manager Knows Too Well:
You're three months into construction. The schedule says you're 60% complete. But are you really? By the time you manually verify progress, update reports, and identify problems, you've already lost precious days—or weeks. Meanwhile, owners are asking for status updates, trade partners are pointing fingers, and your team is spending more time tracking work than actually doing it.
There has to be a better way. And there is.
What You'll Discover:
In this live demonstration, you'll see how Doxel transforms construction project management through automated, objective, AI-powered progress tracking:
- Catch delays before they happen – Watch how Doxel automatically compares your BIM against actual work-in-place to identify variances the moment they occur, not weeks later when it's too late to recover
- Get trade-level and component-level insights – See detailed data showing exactly how fast you're building at every level, from rough-in MEP to finish work, giving you the intelligence to make proactive decisions
- Replace manual tracking with automation – Discover how a simple hardhat-mounted 360° camera and AI computer vision do the work of an entire progress tracking team, reducing tracking time by 95%
- Get everyone on the same page with facts – Learn how visual progress reports give owners, CFOs, and project teams instant clarity on status and schedule risks—no interpretation required
- Make better decisions with accurate data – Explore how teams use Doxel for projections, manpower scheduling, weekly production tracking, visualization, and more—all powered by objective, real-time information
Real Results from Leading Builders:
Hear how construction innovators are transforming project delivery:
- 11% faster project delivery through early problem detection and data-driven decisions
- 16% reduction in monthly cash outflows by optimizing schedules and resource allocation
- 95% less time spent on manual progress tracking and status reporting
- Consistent owner confidence through objective, visual progress documentation
- Historic learning that makes teams better builders on every subsequent project
How It Actually Works (It's Easier Than You Think):
Step 1: Send Doxel your BIM—that's it. No VDC work for your team. Doxel handles setup and gets you started in less than 2 weeks.
Step 2: A crew member walks the site with a 360° camera mounted to their hardhat—something they're already doing during normal site walks.
Step 3: Doxel's computer vision AI analyzes the footage and automatically measures work-in-place for every trade, system, and construction stage, comparing plans to actual progress.
The result? Actionable intelligence delivered faster than any manual tracking process—and far more accurate.
What Makes Doxel Different:
This isn't just another tech solution built by Silicon Valley engineers who've never set foot on a jobsite. Doxel was designed by builders, for builders, with one goal: make construction faster and more predictable.
- Physical Intelligence – AI that understands construction, not just pixels
- No additional VDC burden – Works with your existing BIM, no model prep required
- Objective and consistent – Eliminates subjective progress assessments and disputes
- Trade-agnostic coverage – Tracks every system, every trade, every stage
- Visual reporting – Show stakeholders exactly what's built, not just percentages
- Historic intelligence – Learn from every project to build smarter on the next one
What You'll Experience in This Webinar:
- Live platform demonstration showing real project data and AI analysis
- Before/after comparisons of manual vs. automated tracking workflows
- Case studies from DPR, Layton, Sundt, Scripps Health, and QTS Data Centers
- ROI breakdown showing time savings, cost reductions, and schedule improvements
- Implementation overview – how quickly teams get up and running
- Best practices for using progress data to drive proactive decision-making
- Q&A with Doxel experts and construction practitioners
Who Should Attend:
- Project Managers and Superintendents responsible for schedule performance
- Construction executives seeking competitive advantage through technology
- VDC and Innovation leaders evaluating AI and automation solutions
- Schedulers and project controls professionals drowning in manual tracking
- Owners and developers demanding greater visibility and accountability
- Anyone tired of discovering schedule problems too late to fix them
The Bottom Line:
As Sasan Asadyari from Scripps Health put it: "You can spend a lot of time going through the schedule looking at Gantts, or you can just look at Doxel and see what's actually been built."
The construction industry has operated on subjective progress tracking, delayed problem discovery, and reactive management for too long. Doxel brings the objectivity, speed, and intelligence that modern construction demands.