About this event
Too often we see GCs that claim to be using the Last Planner System to plan a project only to discover a lack of commitment and knowledge of the system. Project after project the trade partners are left without milestones, no constraint management, and no review of PPC or variance so we can improve every week. These are all of the strengths of utilizing LPS but when a GC is not implementing the entire system, the jobsite suffers and trade partners are forced to fend for themselves. This presentation will highlight our experience with a majority of GCs that fall short when using LPS and how that impacts the trade partners on a jobsite.
Michael Villar
Michael currently serves as the Lean Director at Nevell Group, Inc. NGi is an interior and exterior wall system contractor headquartered in Brea California with offices in Northern California and San Diego. Michael is responsible for developing all Lean training for the field and office as well as an in-house certification program. He is a retired Marine helicopter pilot who formerly worked as a Lean Manager at Oakley, Inc and Con-Way Freight. Michael most recently worked as the Process Improvement Manager at KHS&S contractors, which is where he was first introduced to the construction industry. He is a Lean Six Sigma Master Black Belt and is very active with the Lean Construction Institute. He is an LCI certified instructor in Last Planner System®, Lean Project Delivery, and Mindset of Effective Big Room. He has been a featured speaker and instructor at LCI Congress, he was a planning team member for Congress 2019 and 2020, he is a Core Group Member for the LA/OC CoP, and has developed training in culture, 5-S, visual management, problem solving, standard work, and 8-wastes. Michael is passionate about advancing Lean within the construction industry and is a strong advocate for the field. He believes the focus of every Lean effort should directly benefit the field and should ensure work is put in place more efficiently and effectively.
https://www.linkedin.com/in/michael-villar-18375926/
Everyone needs to register in order to attend the webinar. We will send out the webinar recording to everyone that registered. You may purchase our past webinar recording from the online store.
Earn AGC-CM Lean Continuation Education Credits.
AGC recognizes this webinar as quality Lean Construction content and it qualifies for 1.5 hours of AGC CE credit. All attendees can forward the receipt of the webinar to AGC and have the webinar count towards renewing their CM-Lean certificate.