About Webinar
As the project environment becomes ever more complex, and the use of advanced technologies such as AI, machine learning, parametric model becomes more common place in the design and construction space; we need reconsider how we organize work.
What is the new role of the architect?
How can we deliver value with the use of newer technology?
What role does Lean design have in this new paradigm?
In this presentation, Stan Chiu is talk about the future of design. He will explain why using Lean design practices are essential for getting value from the ever growing technology. Through Lean design, we can separate value from waste and be able to more effectively utilize new technology.
Technology is not something that we should fear. Technology is not a panacea. Technology can be a very useful ally in our quest to deliver value. But without proper thinking, sometimes technology can lead us to generating more waste than we would otherwise. There is a fine balance between what is value and what is waste.
Presenter
Earn AGC-CM Lean Continuation Education Credits
AGC recognizes this webinar as quality Lean Construction content and it qualifies for 1.5 hours of AGC CE credit. All attendees can forward the receipt of the webinar to AGC and have the webinar count towards renewing their CM-Lean certificate.
Everyone needs to register in order to attend the webinar. We will send out the webinar recording to everyone that registered. You may purchase our past webinar recording from the online store.